Skip to content
Interior view of a steel greenhouse structure

Steel Greenhouse Structures

A steel greenhouse structure is the galvanized frame that supports under-cover growing. What determines a greenhouse’s service life is not the covering but this frame: the system that withstands snow and wind loads, does not rust in a humid environment and carries the ventilation mechanism.

01Models

Steel Greenhouses models

Every model has a code. Sending us the code on WhatsApp is enough to make clear which model we are talking about.

02Definition

What is a steel greenhouse structure?

The greenhouse frame is the structure that carries the covering and makes the climate inside possible. The posts are anchored to the ground, trusses span the width and purlins hold the covering; the ventilation vents and, if present, the screen system are also attached to this frame. Because the inside of a greenhouse is a constantly high-humidity environment, a galvanized structure is not a choice but a necessity — in this environment, painted steel quickly breaks down at connection points and bolt holes.

The loads a greenhouse has to withstand differ from those of an ordinary building. Snow load builds up on the covering and cannot shed if the slope is not right; wind load, because a greenhouse is so light, creates uplift — the main job of the anchoring is to hold the structure down. On top of these comes the crop hanging load: with crops such as tomatoes, cucumbers and peppers, the plants are hung from the frame, and this is a permanent load measured in tons per decare (1000 m²). A greenhouse built without taking the hanging load into account sags in its first full season.

Ventilation is the second issue that directly determines a greenhouse’s yield. If the hot, humid air that builds up inside in summer is not removed, the temperature reaches a critical level for the plants and the risk of fungal disease increases. Roof ventilation (roof vents) and side ventilation are planned together; because the vent opening mechanism is attached to the frame, this system is not an accessory added later but part of the structure.

There is no single type in this category: tunnel greenhouses, Gothic-arch multi-span greenhouses, Venlo-type glasshouses and seedling greenhouses each call for different spans, heights and ventilation solutions. Without knowing the crop, the region and the production method, there is no meaningful answer to the question “how much per square meter?”

03Types

Greenhouse types

The choice depends on the crop to be grown, the regional climate and the scale of production.

Tunnel greenhouse

A single-span arched structure. It is quick and economical to install and is common in small and medium-scale production. In regions with high snow loads, the arch radius and profile spacing become decisive, because snow can build up on top of the arch.

Multi-span (Gothic-arch) greenhouse

Several spans are joined side by side, with gutters between them. Compared with building the same area as individual tunnels, it uses less material and makes moving around inside easier. The Gothic roof shape helps snow slide off. The drainage of the gutter line is the critical detail here.

Venlo-type glasshouse

A modular system with narrow spans and a low pitch, designed for glass covering. It is the type with the highest light transmission and has a long service life; on the other hand, the frame requires more precise fabrication and the cost is considerably higher. It is preferred in professional production.

Seedling and propagation greenhouse

It calls for a lower height and a more controlled climate. Because the bench system, heating lines and shade screens will be attached to the frame, these are planned from the outset. The hanging load is low, but the equipment load is high.

Storage, packing and technical space

An enclosed section built adjoining the greenhouse. It is used for post-harvest handling, the fertilization unit and the heating boiler. When it is aligned with the greenhouse grid, installation and cost come down together.

04Technical

Materials and technical specifications

Span, height and profile section are determined in the design according to the crop, the regional snow and wind loads and the hanging load.

StructureHot-dip galvanized sections; painted steel is inadequate in a humid environment
Span and heightDepends on the crop; hanging height and interior circulation are decisive
CoveringPE film, polycarbonate or glass; frame detailing varies with the covering
Crop hanging loadA permanent load in vegetable growing; included in the section calculation
Snow and windDepends on the region; for wind, uplift is the deciding factor
AnchoringConcrete footings or screw piles; depending on the soil conditions
VentilationRoof vents + side ventilation; mechanism attached to the frame
Gutters and drainageGutter line in multi-span greenhouses; drainage of rainwater and condensation

05Measurements

Measurement and planning

Greenhouse planning starts with the crop, not with the size of the land. The plant to be grown determines the hanging height and therefore the sidewall height; row spacing and walkways determine the interior layout, and that in turn determines the span. Then comes orientation: the long axis of the greenhouse directly affects how light is distributed through the day and how the prevailing wind acts on the structure. Choosing a section before these three are settled is pointless.

The second step is ground and water. The type of anchoring depends on the ground; concrete footings work in any soil, while in suitable soils screw piles offer a solution that is both fast and removable. Where rainwater — and, in a multi-span greenhouse, the gutter line — will drain is resolved from the start; water pooling around a greenhouse both damages the ground and wears the anchoring. The routes for irrigation and, if present, heating lines are also drawn together with the frame at this stage.

  • Crop and hanging height

    The plant to be grown determines the sidewall height and the hanging load. The section calculation starts here.

  • Orientation and light

    The direction of the long axis affects light distribution and how wind acts on the structure; it is set according to the site.

  • Ground and anchoring

    Concrete footings or screw piles — depending on the soil. In wind, the anchoring’s job is to hold the structure down.

  • Water management

    Drainage of rainwater, condensation and, in multi-span greenhouses, the gutter line is resolved from the start; water should not pool around the greenhouse.

06Process

From site survey to handover

Every job goes through the same seven steps. When one of them is skipped, the problem usually shows up not during installation but at the end of the first year.

  1. 01

    Site survey

    Measurements are taken on site; we see the opening, level differences, ground conditions and any existing structure. The dimensions on paper almost never match those on site exactly.

  2. 02

    Design and drawings

    A technical drawing is prepared from the measurements. Infill divisions, profile sections and any automation layout are finalized at this stage.

  3. 03

    Approval

    The drawing and the color and material choices are approved in writing. Because a change after approval means reversing fabrication, this step is not rushed.

  4. 04

    Fabrication

    Cutting, bending and welding are done in our workshop in Arnavutköy. Weld seams are ground flush with the surface.

  5. 05

    Surface treatment

    The surface is prepared by sandblasting and primed, then electrostatic powder coating is applied. For parts that will stay outdoors, galvanizing comes into play.

  6. 06

    Installation

    On site, the work is anchored, aligned and, if needed, welded in place. If there is automation, the electrical connection and photocell adjustment are completed the same day.

  7. 07

    Handover

    Operation is checked, and use and maintenance are explained. Remote controls are programmed, locks are handed over and any phone app is set up at this stage.

07Price

What determines the price?

Greenhouse quotes are discussed as a figure per decare, but what determines the total is not the area — it is the load and climate that area is built for.

  • Greenhouse type

    Tunnel, multi-span and Venlo types fall into markedly different cost classes.

  • Span and height

    As the hanging height increases, the post section and the wind load increase together.

  • Snow and wind load

    Depends on the region; the same greenhouse needs different profile spacing in two different provinces.

  • Crop hanging load

    In vegetable growing it is counted as a permanent load and directly increases the section size.

  • Choice of covering

    PE film, polycarbonate and glass are different classes; the frame detailing also varies with the covering.

  • Ventilation mechanism

    The number of roof vents and the opening system (manual / motorized) are a separate item.

  • Anchoring and ground

    Concrete footings, screw piles and ground improvement each mean different labor.

08Maintenance

Maintenance and service life

A galvanized greenhouse frame needs little routine maintenance, but two points require regular checks. The first is the anchors and post bases: if irrigation water and rainwater collect in this area, wear eventually sets in even with galvanized protection; the post bases should not be covered with soil, and water should not pool there. The second is the bolted connections — since wind is a continuous and variable load, a torque check should be done once at the end of the first season.

The ventilation mechanism, on the other hand, needs seasonal maintenance. The vent hinges, opening arms and, if present, the gears of the motorized system work amid dust and moisture; cleaning and lubricating them once a year keeps a vent from jamming and failing to open on a hot day. Scratches made on the frame while the covering is being replaced should also be touched up. The frame lasts much longer than the covering; a properly built galvanized frame will see several covering replacements.

09FAQ

Frequently asked questions about Steel Greenhouses

  • Do you also supply the covering?

    Our core work is the load-bearing frame and its fabrication. The covering (PE film, polycarbonate, glass) and climate control equipment are separate items; if you wish, we plan them together within the scope. What matters is that the covering type is known when the frame is designed — profile detailing, purlin spacing and slope are set up differently for glass and for film.

  • Why galvanizing — wouldn’t paint do?

    The inside of a greenhouse is a constantly high-humidity environment, and condensation collects directly on the sections. In this environment, painted steel breaks down at connection points, bolt holes and scratches; corrosion starts there and usually progresses in places out of sight. Since hot-dip galvanizing also protects cut and scratched spots, it is our standard choice for greenhouses.

  • Will snow load be a problem?

    It will if it is not calculated, and it is the most common cause of damage to greenhouses. The regional snow load directly determines the profile section and the truss spacing; because the Gothic roof shape helps snow slide off, it comes to the fore in regions with high snow loads. We do not take on a job without doing this calculation.

  • Can I hang plants from the frame?

    You can, but it is a load that needs to be known from the start. With crops such as tomatoes, cucumbers and peppers, the hanging load is measured in tons per decare and is permanent. In a greenhouse built without accounting for it, the frame sags in its first full season. During the site survey, tell us what you will grow, and we will choose the section accordingly.

  • Can I do without ventilation?

    No. If the hot, humid air that builds up inside in summer is not removed, the temperature reaches a critical level for the plants and the risk of fungal disease rises significantly. Roof and side ventilation are part of the frame, not an accessory added later. Whether it is manual or motorized is decided according to the scale.

  • Can I expand my greenhouse later?

    Multi-span greenhouses are well suited to this: the new span continues from the existing grid and the gutter line is extended. If the possibility of expansion is mentioned at the start, the end trusses are chosen accordingly and the extension is very easy. If not, the end section may need to be reinforced. With tunnel greenhouses, adding a new tunnel usually makes more sense.

  • How long does it take to build?

    The timeline is driven by profile preparation and the galvanizing process; installation on site is short by comparison. Since the exact timeline depends on the area, the greenhouse type and the scope of ventilation, we give it together with the quote. Galvanizing is a separate stage, so we include it in the schedule as well.

  • Do you help with agricultural subsidies and permits?

    We prepare the structural calculations and construction drawings, and we provide the technical documents required for applications. Agricultural support programs and the permit process, however, vary depending on how the provincial directorate of agriculture and the municipality apply them; we cannot give definitive information on these matters and recommend confirming with the relevant authority.

10Guides

Read before you decide

Topics that come up often at the decision stage and fall outside the technical scope of this page.

14Service areas

Areas we serve for Steel Greenhouses

Fabrication takes place in our own workshop in Arnavutköy; delivery and installation are carried out across Türkiye. Each area page describes local conditions and the delivery plan.

All service areas

14 / Contact

Send us your measurements for Steel Greenhouses

Approximate measurements and your district are enough for us to outline the quote. Let’s set the best day for the site survey in the same conversation.