
Steel Mezzanines
A steel mezzanine increases usable floor area by building a second floor deck inside a high-ceilinged space. It is installed without constructing a new building and often without stopping production; the deciding factors are the ceiling height and where the load will be carried down.
01Models
Mezzanines & Setback Floors models
Every model has a code. Sending us the code on WhatsApp is enough to make clear which model we are talking about.
02Definition
What is a steel mezzanine, and where is it used?
A mezzanine is an independent floor system built inside an existing space. Columns stand on the ground slab, beams span the opening and the floor deck goes on top. The basic principle is that it puts no load on the existing building’s walls or columns — the structure stands on its own legs and moves independently of the building. So although it is sometimes called a suspended floor, a mezzanine usually hangs from nothing at all; ceiling-hung solutions are used only when the calculations for the existing structure allow it.
The economics are simple: the upper half of a space you are already paying rent for is standing empty. If the ceiling height is sufficient, that void becomes storage, offices, a break area or a packing section. Compared with constructing a new building, relocating or renting additional land, it is both much faster and much less costly. Another reason it is chosen for rented premises is that it can be dismantled and moved.
It is most often installed in warehouses and logistics facilities, production workshops, showrooms and stores, and service and repair workshops. In stores, the offices and stock areas usually move upstairs so the sales floor can grow below. In workshops, heavy production stays downstairs while light assembly and storage move up.
Height is the most critical issue in this work, and it is often underestimated. When a mezzanine is installed, not one but three heights are set at once: the clear height below, the thickness of the floor itself and the clear height above. Together, the three cannot exceed the usable height up to the underside of the lowest beam. If a forklift will pass underneath and people will stand upright above, all three are calculated from the start — this is not something that can be corrected later.
03Types
Mezzanine types
The choice depends on how the space underneath will be used and on the load to be carried.
Freestanding (independent) mezzanine
It stands on the floor on its own columns and puts no load at all on the existing building. It is the most common and the safest solution, and it is also preferred in rented premises because it can be dismantled and moved. The number of columns is planned so that they do not interrupt the use of the space below.
Wall-supported mezzanine
One edge bears on an existing wall and the other on columns. Fewer columns are needed, leaving a more open space below. The condition is that the wall can carry this load: reinforced concrete and solid brick are suitable; aerated concrete and hollow brick are not. This is always checked during the site survey.
Rack-integrated floor
The columns that carry the floor also serve as rack uprights. In warehouses this gets the most out of every square meter, because the columns take up no separate space. Since a change to the rack layout would also affect the structure, the layout is finalized at the outset.
Office floor (light-duty)
If the upper level will hold only offices, a break area or a meeting room, the live load is kept low and the sections become lighter. Sound insulation and vibration are a separate topic here: if forklifts operate below, floor vibration is felt upstairs, so the decking and beam spacing are chosen accordingly.
Heavy-duty storage floor
If pallets, materials or machinery will sit on top, the live load rises significantly and the sections get larger. How much load, where, and how it will be distributed — no section is chosen until these three questions are answered. Concentrated heavy loads (machine feet) are calculated separately.
04Technical
Materials and technical specifications
Member sections and floor type are determined in the design according to the span, the load to be carried and the existing ceiling height.
| Structure | Columns + main beams + secondary beams; sections determined by calculation |
|---|---|
| Floor | Composite steel deck + concrete, steel grating or screw-fixed panels |
| Live load | Depends on use; office, light storage and heavy storage are different classes |
| Clear height | Below + floor thickness + above; the total cannot exceed the underside of the lowest beam |
| Stairs | Straight flight or with landings; width and riser height according to use |
| Railing | Along the edges; height and infill according to the regulations for the intended use |
| Anchoring | Column base plates + anchors; floor slab thickness measured during the site survey |
| Finish | Sandblasting + primer + paint; galvanizing in humid spaces |
05Measurements
Measurement and planning
With a mezzanine, the first step in measuring is to find the true total usable height: from the floor up to the underside of the lowest beam, not to the ceiling itself. Then that height is divided three ways: what will pass underneath (people, pallet jacks, forklifts, vehicles), how thick the floor will be, and what will happen above (standing work, seated work, storage only). Calculating floor area before this split is made is pointless, because in most spaces the constraint is height, not square meters.
The second step is the floor slab. If the columns will stand on the existing concrete slab, its thickness and condition are checked; on a thin or worn slab, separate footings have to be provided under the columns. The third step is escape and access: the stair location, the escape distance required by the fire regulations and how loads will get upstairs (stairs, a freight elevator, pallet access by forklift) are planned from the outset.
Dividing the three heights
Clear height below + floor thickness + clear height above. If a forklift will pass underneath, this is the deciding constraint, and it cannot be changed later.
Load to be carried
What will sit on top, how heavy it is, and whether it is concentrated or distributed. The section follows from these answers.
Floor slab and anchoring
The thickness of the existing concrete is measured; if it is insufficient, separate footings are provided under the columns.
Stairs and escape
The stair location should not interrupt the use of the space below; the escape distance and the way loads are taken upstairs are planned from the outset.
06Process
From site survey to handover
Every job goes through the same seven steps. When one of them is skipped, the problem usually shows up not during installation but at the end of the first year.
- 01
Site survey
Measurements are taken on site; we see the opening, level differences, ground conditions and any existing structure. The dimensions on paper almost never match those on site exactly.
- 02
Design and drawings
A technical drawing is prepared from the measurements. Infill divisions, profile sections and any automation layout are finalized at this stage.
- 03
Approval
The drawing and the color and material choices are approved in writing. Because a change after approval means reversing fabrication, this step is not rushed.
- 04
Fabrication
Cutting, bending and welding are done in our workshop in Arnavutköy. Weld seams are ground flush with the surface.
- 05
Surface treatment
The surface is prepared by sandblasting and primed, then electrostatic powder coating is applied. For parts that will stay outdoors, galvanizing comes into play.
- 06
Installation
On site, the work is anchored, aligned and, if needed, welded in place. If there is automation, the electrical connection and photocell adjustment are completed the same day.
- 07
Handover
Operation is checked, and use and maintenance are explained. Remote controls are programmed, locks are handed over and any phone app is set up at this stage.
07Price
What determines the price?
Mezzanines tend to be discussed in price per square meter, but what determines the total is not the square meters — it is what those square meters have to carry.
Live load class
The difference between office use and heavy storage changes the sections significantly for the same floor area.
Span and number of columns
Every meter you want kept column-free below increases the beam section.
Floor type
Composite deck + concrete, steel grating and panels fall into different cost and weight classes.
Stairs and railings
Stair type, number of landings and railing length are separate items.
Floor slab condition
If the existing concrete is insufficient, providing footings under the columns expands the scope.
Working conditions
If the work has to be done without stopping production, or on weekends or at night, the installation plan and timeline change.
08Maintenance
Maintenance and service life
A mezzanine standing in an enclosed space has a low risk of corrosion; maintenance is really about the connections and load discipline. The column base anchor bolts and beam connections should be checked once at the end of the first year — it is normal for a few bolts to lose torque as the structure settles after installation. After that, a visual inspection every few years is enough.
The real risk is the floor being used differently from how it was designed. Stacking pallets on a floor designed as an office, or placing machinery on one built for light storage, takes the system beyond its design limits — and this cannot be seen from the outside. That is why we state the floor’s load limit on a visible sign. If the use is going to change, ask first: in most cases the floor can be strengthened, but loading it without calculations is not an option.
09FAQ
Frequently asked questions about Mezzanines & Setback Floors
How high does my ceiling need to be?
Giving a single threshold figure would be misleading, because what decides it is the sum of three heights: what will pass underneath, how thick the floor will be and what will happen above. If only people will pass underneath and the upper level is for storage, a lower ceiling may be enough; with forklifts below and standing work above, the required height rises significantly. Send us your ceiling height and what you plan to do on each level, and we will tell you whether it works.
Will it damage my building?
Not with a freestanding system; the structure stands on the floor on its own columns and puts no load on the existing building. With a wall-supported solution, however, the wall must be able to carry the load — reinforced concrete and solid brick are suitable; aerated concrete and hollow brick are not. We do not recommend a wall-supported solution without first checking the wall during the site survey.
I’m a tenant. Can I take it down when I move?
Yes, this is one of the most common reasons people choose a mezzanine. When the connections are bolted, the structure can be dismantled and re-erected somewhere else. If the new premises have a different ceiling height or floor slab, some parts may change, but most of the structure is retained. If there is a chance you will move, tell us at the start.
Do I need to stop production?
On most jobs, no. The structure is prepared in the workshop and arrives on site ready to install; the noisy, dusty work on site is kept limited. Even so, the area where the columns will stand has to be cleared and made safe during installation. Working on weekends or outside shift hours is possible; we put the plan together with you.
How much load can it carry?
Load capacity is a design decision made at the outset, not a property that emerges afterward. Office, light storage and heavy storage are different classes, and the sections are selected accordingly. Tell us what will sit on top, how heavy it will be and whether the load is concentrated or distributed; we will design the capacity around that and mark it on the floor with a visible sign.
When I’m working below, can I feel people walking above?
It depends on the floor type and the beam spacing. Steel grating is light but transmits more vibration; a composite deck + concrete floor is noticeably quieter and stiffer. If there are offices above and production below, we recommend a composite floor. In the opposite case (offices below, forklifts above), vibration is treated as a separate issue.
Do I need a permit?
It depends on the building’s use, its floor area and how your municipality applies the rules; in some cases a renovation permit is required. We cannot give definitive information on this, so we recommend confirming with your municipality. We prepare the structural calculations and construction drawings, and we provide the documents required during the process.
Are there any fire safety obligations?
Because a mezzanine changes escape distances and stair requirements, fire regulations apply directly to this work. Escape routes, the number of stairs and, where necessary, fire protection for the structure are addressed at the design stage. That is why it matters that you describe how the floor will be used accurately from the start.
10Guides
Read before you decide
Topics that come up often at the decision stage and fall outside the technical scope of this page.
11Related services
Work often done alongside this




14 / Contact
Send us your measurements for Mezzanines & Setback Floors
Approximate measurements and your district are enough for us to outline the quote. Let’s set the best day for the site survey in the same conversation.
