Metal fabrication and installation in Arnavutköy

The district where our workshop is based; villa plots sit side by side with the Hadımköy industrial belt.

This page also covers the surrounding area: Hadımköy · Bolluca · Haraççı · Taşoluk

01Area

What kind of work comes up in Arnavutköy?

Arnavutköy is different from every other district for us: our workshop is here. In practical terms, this means a shorter gap between measuring and installation, and being able to come back the same day if an extra part is needed. This is where we are most flexible in scheduling site surveys.

The district itself has two distinct kinds of built fabric. Along the Bolluca, Haraççı and Taşoluk corridor there are detached-house and villa plots, where entrance gates, wall-top railings and garden enclosures are the main work. Because the plots are usually large, driveway gate openings are kept wide, and sliding systems are chosen more often than double-leaf swing gates.

The Hadımköy belt is an entirely different line of work: warehouses, workshops, logistics facilities and production buildings. Requests here are for steel construction, roof renewal, mezzanines and site perimeter fencing. Since the two areas are close to each other, we can take on a villa entrance and a warehouse roof in the same week.

Being close to the workshop has another benefit: when we take on work here, we have more freedom over part length and installation method. A structure that would have to be split to fit within transport limits for distant provinces can be delivered in one piece within Arnavutköy. That reduces the number of joints on site and shortens installation time.

Demand profile

The bulk of requests from Arnavutköy are for villa entrance gates and wall-top railings. Most plots along the Bolluca, Haraççı and Taşoluk corridor face the road and already have a garden wall in place; the railing sits on top of that wall, and the gate fills the opening the wall leaves. These two jobs are often measured together during the same site survey.

Second come steel construction and roofing jobs from the Hadımköy belt. Demand here is not seasonal; it follows the growth of the facility: an additional structure when storage space runs short, a mezzanine when the existing volume is enough, and new roof cladding when the roof starts to leak. Mesh panel fencing comes up in both areas — as a garden boundary for villas and for site security in industry.

03Local conditions

What drives our decisions in Arnavutköy?

Climate, ground, wind and access conditions directly change our decisions on sections, surface treatment and installation. This section explains what we do differently in this area, and why.

  1. 01

    The top surface of the garden wall

    With a wall-top railing, what determines its lifespan is not the railing itself but the surface it sits on. On some plots in Arnavutköy the wall was built years ago and its top surface is wavy; a railing set along that line looks visibly crooked. During the site survey we run a straightedge along the top of the wall and measure the deviation. If it exceeds a few centimeters, either the top surface is leveled or each post length is calculated individually.

  2. 02

    Wide plot, wide opening

    Large villa plots also mean larger driveway gate openings; openings over 4 meters are the rule here, not the exception. At this scale a double-leaf swing gate struggles, because the weight of each leaf bears on the hinges. A sliding system comes to the fore, and the choice depends on the side run: if there is a continuous, level stretch along the wall the gate will slide past, we discuss a tracked sliding gate; if the ground level is uneven, a cantilever sliding gate.

  3. 03

    Ground and access in the Hadımköy belt

    On industrial plots the main obstacle to installation is not technical but access: where the crane will be set up, whether a tractor-trailer can get onto the site, and at what hours production stops. We note these during the site survey and size the parts accordingly. Ground settlement can also occur on recently filled sites; we do not decide on column foundations without looking at the ground.

  4. 04

    What proximity to the workshop means technically

    A structure that would have to be split to fit within transport limits for distant provinces can often be delivered in one piece within Arnavutköy. The direct result is fewer joints on site: every site joint is a weak point in terms of both installation time and surface treatment. A weld completed in the workshop is always more controlled than one made on site.

04From the field

Situations we often encounter in this area

We don’t give client names, project names or dates; what we describe is the situation itself and how it was solved.

  • The wall went up before the gate was sized

    A situation we see often: the garden wall was built before the gate size was known, and the opening has ended up narrower than expected or out of line. There are two options here — make the gate smaller to suit the opening, or take down one end of the wall. In most cases a third option works: fabricate the gate frame with a concealed taper that follows the opening, so the misalignment is absorbed within the frame. Because we measure at three points rather than one, this misalignment is caught during the site survey.

  • The warehouse roof leaks, but production can’t stop

    This is the most common roofing request in Hadımköy. The structural members and cladding are prepared in the workshop, the site work proceeds section by section, and which section will be closed off and when is planned in advance. This method works in most facilities; where it does not is when services hung from the roof (ventilation, lighting, piping) are so dense that work is impossible without removing them. In that case the plan is built around the facility’s shutdown schedule.

  • The railing and the gate don’t match

    When the gate and the railing are ordered at different times, a difference in shade can show when they stand side by side, even if they were given the same RAL code: a surface that has been in the sun no longer has the shade it had on day one. So if the two are planned together, we paint them in the same batch; if they will be made at different times, we discuss up front taking a sample from the existing surface and matching it.

06Delivery and installation

How do site surveys and installation work in Arnavutköy?

Since fabrication already takes place within the district, delivery needs no separate planning; parts leave the workshop and go straight to site. Scheduling for site surveys and installation is most flexible here.

Measuring is usually done in a single visit; for work that has to fit an existing structure, such as a wall-top railing, a second verification visit may be needed. Installation time depends on the size of the job — a single entrance gate and a warehouse roof are not on the same scale. We state the exact number of days in the quote once the measurements and site conditions are clear.

We have no branches or dealers; all fabrication is done in our own workshop in Arnavutköy. Price and lead time depend on the size of the job, the opening and the installation conditions — so we don’t quote a figure or a number of days up front here. Send your measurements and location, and we’ll work it out for your project.

07FAQ

Frequently asked questions for Arnavutköy

  • Can I visit the workshop and see the fabrication?

    Yes, you can. Since you are in Arnavutköy, this is easiest here; let us know in advance and we will show you work in progress and the surface treatment stages in person. When deciding on a gate or railing, seeing and handling the profile section and infill spacing is far clearer than looking at a catalog.

  • Can you renew my warehouse roof in Hadımköy without stopping production?

    In most cases, yes. The structural members and cladding are prepared in the workshop and arrive ready to install; the site work proceeds section by section. We plan with you which section will be closed off and when. Since the exact duration depends on the roof area and the cladding type, we give it together with the quote.

  • My plot is large and my driveway gate opening is wide — which system suits it?

    For wide openings a sliding system usually comes out ahead, because on a double-leaf swing gate the weight of the leaves strains the hinges. The deciding factor is the side run: is there a continuous, level stretch along the wall the gate will slide past? If so, we discuss a tracked sliding gate; if the ground level is uneven, a cantilever sliding gate. Send us measurements and photos, and we will tell you which one fits.

  • My garden wall is uneven — will the railing look straight?

    It will, but how it sits is decided at the outset. We run a straightedge along the top of the wall and measure the deviation. If the deviation is small, the railing is kept level by adjusting each post length individually; if it is large, either the top surface is leveled or the railing is fabricated to follow the line of the wall. The two look different, and we decide together during the site survey which one suits your wall.

  • Is there an advantage to having the gate and the railing made as one job?

    We cannot say anything about price in advance; it is determined by the project. Technically, though, the advantage is clear: both are painted in the same batch so the shade matches, they are measured in one site survey, and there is a single installation plan. When they are ordered at different times, the most common problem is a difference in shade.

  • How soon can you come to my site in Hadımköy?

    Since the workshop is in the same district, this is where we are most flexible in scheduling site surveys; rather than committing to a fixed day, we confirm the schedule once we are in touch. The installation date depends on fabrication time, which in turn depends on the size of the job. Send us your measurements and a photo of the site on WhatsApp, and we will work out a realistic schedule.