Türkiye · Province
Metal fabrication and installation in Ankara
A harsh continental climate: snow load, wide temperature swings and freeze–thaw cycles drive the design.
This page also covers the surrounding area: Çankaya · Gölbaşı · İncek · Sincan
01Area
What kind of work comes up in Ankara?
In Ankara, the climate drives the design. The continental climate has two effects, and both bear directly on metal: heavy snow loads in winter, and very wide temperature swings within a day. A roof section that works well in Istanbul can be inadequate in Ankara; so we calculate snow load for the location rather than carrying over a standard section as is.
Temperature swing is the second issue. Steel expands when it heats up and contracts when it cools; on a facade that sees a difference of more than twenty degrees between day and night, this movement becomes significant. Long railing and facade runs need expansion joints, and cladding must be fixed so that it can move rather than being pinned point by point. Without joints, the connection points are overstressed and the cladding eventually starts to work loose.
The third is the freeze–thaw cycle. Water freezing and thawing opens up the surface, starting at the paint’s weakest point. That is why, for fabrication going to Ankara, all cutting and drilling is finished before painting; a hole drilled on site means an edge left unprotected. We also prefer details that do not hold water — sloped rather than flat top surfaces, and closed ends on hollow sections.
Demand for villas and detached houses is strong along the Çankaya, Gölbaşı and İncek belt; entrance gates, automation and wall-top railings are what we work on most. From Sincan and the organized industrial corridor come warehouse and roof jobs. Because the distance to Ankara requires planned shipping, we size parts to suit transport.
Demand profile
Most of our work from Ankara is for villas and detached houses along the Çankaya, Gölbaşı and İncek belt: entrance gates, automation, wall-top railings and wrought iron. Sincan and the organized industrial corridor bring demand for warehouse steel structures and roofs.
Demand also has a seasonal side. Because installation is the only weather-dependent stage, jobs tend to pile up in spring and fall. That is why we recommend early planning to customers in Ankara for jobs targeted for winter — fabrication continues through the winter; what limits us is conditions on site.
02Services
Featured work in Ankara
This list is based on the requests we receive most often from this area. You can also write to us about work that isn’t on the list.
- Villa Driveway GatesSliding, double-leaf swing and cantilever sliding garden gates, made to measure.
- Automatic Villa GatesMotorized sliding and swing systems, safety photocells and remote control.
- Wall-Top RailingsWrought iron and modern railing designs that complete the garden wall.
- Steel RoofsComplete roof structures, with purlins, trusses and roofing.
- Steel ConstructionStructural steel systems for warehouses, workshops and commercial buildings.
03Local conditions
What drives our decisions in Ankara?
Climate, ground, wind and access conditions directly change our decisions on sections, surface treatment and installation. This section explains what we do differently in this area, and why.
01
Snow load and roof geometry
The first effect of the continental climate is snow load. Unlike wind, snow stays on the roof for a long time, and this directly determines slope and purlin spacing. A roof section that works well in Istanbul can be inadequate in Ankara; we calculate snow load for the location rather than carrying over a standard section as is. Insufficient slope also lets snow sit on the roof, and the meltwater turns to ice.
02
Wide temperature swings and expansion
Steel expands when it heats up and contracts when it cools. On a facade that sees a difference of more than twenty degrees between day and night, this movement becomes measurable. Long railing and facade runs need an expansion allowance, and cladding must be fixed so that it can move. Without that allowance, the connection points take the strain and the cladding eventually starts to work loose.
03
Freeze–thaw and surface integrity
Water freezing and thawing opens up the surface, starting at the paint’s weakest point. That is why, for fabrication going to Ankara, all cutting and drilling is finished before painting — a hole drilled on site means an edge left unprotected. We also prefer details that do not hold water: sloped rather than flat top surfaces, and closed ends on hollow sections.
04From the field
Situations we often encounter in this area
We don’t give client names, project names or dates; what we describe is the situation itself and how it was solved.
Installation requested in midwinter
Because painting and surface treatment are completed entirely in the workshop, installation is the only weather-dependent stage. When snow, ice and wind make working at height unsafe, we recommend postponing installation; a forced installation is risky for both safety and workmanship. We plan the schedule together around the weather and carry on with fabrication regardless of the wait.
Play in a long railing run
A complaint that comes a few years later: loosening and slight play at the connection points of a long railing run. The cause is usually not the material but the fact that the run was fixed as if it were one piece, with no room left for expansion. In new fabrication, we break the run at set intervals and design the connections to absorb the movement; on existing runs, adding break points is often enough.
05Models
The models we’re asked about most in this area
All are made to measure; the model is a starting point. Changes can be made to suit the dimensions and the opening.

Anthracite Horizontal-Slat Sliding Villa Gate
Villa Driveway Gates · Anthracite gray (RAL 7016)

Double-Leaf Wrought Iron Villa Gate
Villa Driveway Gates · Matte black with antique gold patina

Motorized Sliding Villa Gate System
Automatic Villa Gates · To match the gate color

Motorized Double-Leaf Villa Gate System
Automatic Villa Gates · To match the gate color

Vertical-Bar Wall-Top Railing
Wall-Top Railings · Anthracite or matte black

Horizontal-Slat Wall-Top Railing
Wall-Top Railings · Anthracite gray (RAL 7016)
06Delivery and installation
How do we get from Arnavutköy to Ankara?
Shipments from Arnavutköy to Ankara are planned; parts are prepared in sizes suited to transport and joined on site. The installation schedule and crew plan are stated in the quote according to the size of the job.
Measuring usually takes a single visit; for automated gates, the condition of the electrical supply is checked on the same visit. Because of the distance, parts are prepared in sizes suited to transport and joined on site. Installation time depends on the size of the job and the weather; we state the exact number of days in the quote after the site survey.
We have no branches or dealers; all fabrication is done in our own workshop in Arnavutköy. Price and lead time depend on the size of the job, the opening and the installation conditions — so we don’t quote a figure or a number of days up front here. Send your measurements and location, and we’ll work it out for your project.
07FAQ
Frequently asked questions for Ankara
How does Ankara’s winter affect fabrication?
In three ways: snow load goes into the section calculation, wide temperature swings call for an expansion allowance, and the freeze–thaw cycle makes surface treatment critical. If the design addresses all three, the harsh climate is not a problem; if not, it shows within the first few winters.
Can installation be done in winter?
Installation can be done in winter too; the constraint lies mostly in site conditions — snow, ice and wind can make working at height unsafe. Because painting and surface treatment are completed entirely in the workshop, installation is the only weather-dependent stage. We plan the schedule together around the weather.
Does it cost extra for you to come to Ankara for installation?
For jobs outside the city, shipping and installation planning are included in the quote; we set out the line items and terms clearly in it. We cannot give a figure in advance here, because the size of the job, the number of parts and the installation time are what decide it. Send us your measurements and location on WhatsApp, and we will work it out for your project.
Can I have the same gate as an Istanbul project made for Ankara?
We can keep the appearance exactly; what changes is the structure and the detailing. Snow load, expansion allowance and the scope of surface treatment are reset for Ankara’s conditions. Sending the same gate exactly as built for Istanbul leads to problems that show within the first few winters.
What does an expansion allowance mean on a long railing run?
Steel expands and contracts with temperature; on a long run, this movement strains the connections. Leaving an allowance means breaking the run at set intervals and designing the connections to absorb the movement. You can’t see it, but it makes the difference between a run that loosens after a few winters and one that stays solid.
If I order in winter, will it be ready by spring?
Fabrication continues through the winter; what limits us is installation conditions on site. Ordering in the winter months is actually an advantage: fabrication progresses through the winter, and installation goes to the front of the queue when the weather clears. Tell us your target date, and we will draw up a realistic schedule.