Skip to content

Istanbul · District

Metal fabrication and installation in Eyüpsultan

Wooded villa complexes and detached plots with large gardens along the Göktürk–Kemerburgaz corridor.

This page also covers the surrounding area: Göktürk · Kemerburgaz · Akpınar

01Area

What kind of work comes up in Eyüpsultan?

In Eyüpsultan, most of our work is concentrated along the Göktürk and Kemerburgaz corridor. The built fabric here differs from most of Istanbul: plots are large, tree cover is dense, and villas usually sit back from the road at the end of a long driveway. This makes the entrance gate not just a boundary but the first visible face of the property.

Tree density is also a technical factor. If there are trees on both sides of the driveway, the side run a sliding gate would slide into is often obstructed; in that case we discuss a double-leaf swing gate or a cantilever solution. On heavily wooded plots, leaves building up in the fall also strain tracked systems — drainage of the track line is the main subject of the site survey here.

The second common topic is automation. On plots with a long driveway, opening the gate from the car becomes a necessity rather than a convenience; a keypad or intercom is usually requested alongside the remote control. Providing for the cable route during fabrication is especially important here, because cable laid later remains visible along the length of the driveway.

Canopies and pergolas are a permanent topic here, not a seasonal one. Carports and terrace covers are frequently requested in large gardens; column placement is determined by how the car doors open and by the tree roots in the garden. Sloping it in the right direction also matters: a canopy sloped the wrong way collects water in front of the door in the rain instead of protecting it.

Demand profile

Most of the work from Eyüpsultan is villa entrances along the Göktürk and Kemerburgaz corridor: driveway gates, pedestrian gates and their automation. Because the plots are large, the driveway is long and the gate is the first surface seen, before the house itself; so materials and surface treatment are discussed in more detail here than in other districts.

Second come canopies and pergolas. In large gardens, carport covers and terrace shading are a permanent topic, not a seasonal one. Wall-top railings and wrought iron are usually planned together with the gate; carrying the same motif from the entrance all the way to the garden boundary is a frequent request here.

03Local conditions

What drives our decisions in Eyüpsultan?

Climate, ground, wind and access conditions directly change our decisions on sections, surface treatment and installation. This section explains what we do differently in this area, and why.

  1. 01

    Tree density and root zones

    On wooded plots, trees shape both the design and the installation. If a trunk or root protrudes along the side run of a sliding gate, a tracked system will not work there. Digging into the root zone for a column foundation also weakens the tree; during the site survey we shift the foundation position to suit the tree and, if necessary, solve the column with a deeper, narrower section.

  2. 02

    Long driveways and automation range

    On driveways up to a hundred meters long, the range of a remote control alone may not be enough. On these runs we usually discuss a second receiver or a phone-controlled module. And because the cable run between the gate and the house is long, the cable cross-section calculation becomes important: a thin cable prevents the motor from working properly over a long distance.

  3. 03

    A damp, shaded microclimate

    On plots within woodland, surfaces that never see the sun stay damp for long periods, and this changes where corrosion starts: deterioration that begins on top surfaces in open areas starts here at the shaded lower edges and at the base of joints. So we cap the ends of hollow sections, avoid details that trap water, and choose the surface treatment with the shaded surfaces in mind.

04From the field

Situations we often encounter in this area

We don’t give client names, project names or dates; what we describe is the situation itself and how it was solved.

  • A sliding gate is wanted, but the side run is blocked

    This is the most common situation in the Göktürk area: the client wants a sliding gate, but there is a tree, a retaining wall or a level difference along the line the gate would slide into. That leaves two options — a double-leaf swing gate if there is enough clearance in front of the gate, or otherwise a cantilever sliding gate. With a cantilever, the gate is held clear of the ground, so there is no track on the ground, but extra length is needed behind it for the counterweight. We decide which one fits from a photo of the entrance and the level information.

  • Leaves clog the track

    A recurring complaint with tracked systems in wooded areas. The problem is not the motor but the track: when leaves and soil build up on it, the wheel rides up and the motor strains. In new fabrication, setting the slope and drainage of the track correctly reduces this significantly; on existing systems, cleaning once a year prevents most faults before they occur. On plots with heavy leaf fall, we recommend a cantilever sliding gate from the outset.

06Delivery and installation

How do we get from Arnavutköy to Eyüpsultan?

Delivery from Arnavutköy to the Göktürk and Kemerburgaz corridor is a short trip; installation is usually completed in one go. Where access within the plot is narrow, we plan part lengths accordingly.

Measurements are taken in a single visit; if automation is involved, the existing electrical supply is inspected the same day. Installation time depends on the gate type and whether column foundations are needed — on jobs that require pouring a foundation, concrete curing time becomes part of the schedule. We state the exact number of days in the quote after the site survey.

We have no branches or dealers; all fabrication is done in our own workshop in Arnavutköy. Price and lead time depend on the size of the job, the opening and the installation conditions — so we don’t quote a figure or a number of days up front here. Send your measurements and location, and we’ll work it out for your project.

07FAQ

Frequently asked questions for Eyüpsultan

  • My driveway is long and I want to open the gate from the car — what do I need?

    The gate motor, safety photocells, warning light and remote control receiver are installed as one system. On long driveways the remote’s range may not be enough, so a second method (a keypad or intercom) is usually added as well. What matters most is providing for the cable route during fabrication; cable laid afterward stays visible and requires digging.

  • There are trees in my garden — can I have a sliding gate?

    If there is a tree, a root or a projection along the side run the gate would slide into, a tracked sliding gate will not work there. That leaves two options: a double-leaf swing gate (if there is enough clearance in front of the gate) or a cantilever sliding gate (if the side run is short but unobstructed). During the site survey we walk the line and decide on the spot which one fits.

  • Leaves clog the track in the fall — is there a fix?

    With a tracked system, the problem drops significantly when the slope and drainage of the track are set up correctly; cleaning once a year prevents most faults before they occur. If tree density is very high, we recommend a cantilever sliding gate — there is no track on the ground to clean.

  • Can gate columns be built without harming the trees in my garden?

    Yes. During the site survey we set the column position according to the tree’s root zone; if necessary, we build a narrower, deeper foundation to stay outside the root spread. On some plots, shifting the gate line by half a meter is the cleanest solution — that is impossible to say without seeing the site.

  • Can I enclose my carport later?

    Yes, if you tell us at the start. A carport whose sides will be enclosed later is calculated differently from one that will stay open: enclosed surfaces increase the wind load, and the columns and anchoring are chosen accordingly. If you mention the possibility of enclosing it during the site survey, we build the structure for it and keep the additional cost small.

  • Can we carry the same motif from the gate to the garden railing?

    We can; it is a frequent request here. The point we watch is scale: a motif that looks right on a gate can look busy when repeated along a long run of railing. We usually balance it by spacing the motif out on the railing or using it only at set intervals. We decide by showing the two side by side in the drawing.